Online

Capacidades de la ingeniería nacional y tomadores de decisiones: la construcción de la represa hidroeléctrica en Rincón del Bonete, Uruguay 1904-1945.

Fil: Waiter, Andrea. Universidad de la República. Unidad Académica de la Comisión Sectorial de Investigación Científica; Uruguay.

Saved in:
Bibliographic Details
Main Author: Waiter, Andrea
Format: Online
Language:Spanish
Published: 2020
Subjects:
Online Access:http://ridaa.unq.edu.ar/handle/20.500.11807/5719
_version_ 1866438176406503424
author Waiter, Andrea
author_facet Waiter, Andrea
author_sort Waiter, Andrea
collection Editorial - UNQ
description Fil: Waiter, Andrea. Universidad de la República. Unidad Académica de la Comisión Sectorial de Investigación Científica; Uruguay.
format Online
info:eu-repo/semantics/article
id ir-20.500.11807-5719
institution RIDAA-UNQ
language spa
publishDate 2020
record_format dspace
spelling ir-20.500.11807-57192025-10-15T14:28:22Z Capacidades de la ingeniería nacional y tomadores de decisiones: la construcción de la represa hidroeléctrica en Rincón del Bonete, Uruguay 1904-1945. National engineering capabilities and decision-makers: the construction of the hydroelectric dam in Rincón del Bonete, Uruguay, 1904–1945. Waiter, Andrea Energía hidroeléctrica Política científica y tecnológica Innovaciones Política públicas Uruguay Hydroelectric power Scientific and technological policy Innovations Public policies Energia hidrelétrica Política científica e tecnológica Inovações Fil: Waiter, Andrea. Universidad de la República. Unidad Académica de la Comisión Sectorial de Investigación Científica; Uruguay. El presente estudio hace foco en la historia de la construcción de la primera represa de generación de energía hidroeléctrica uruguaya de abastecimiento público, Represa Rincón del Bonete, inaugurada en diciembre de 1945. El período de estudio comienza en 1904, año en que se realiza la primera propuesta para el aprovechamiento del Río Negro para la generación de energía eléctrica y culmina en 1945, año en que se pone en funcionamiento la primera turbina en la unidad 2 de la Represa. En el tiempo transcurrido entre ambos extremos existieron diferentes configuraciones político-institucionales que, entendemos, pueden dar cuenta de una demora de más de cuarenta años entre que se planteó la idea sobre el aprovechamiento del Río Negro para la hidroelectricidad y su materialización. Este trabajo pretende profundizar en cada una de dichas configuraciones desde una perspectiva sistémica donde los vínculos y relaciones entre ingenieros y gobierno cobran especial importancia. El proceso de construcción de la Represa es analizado bajo la lupa de las relaciones entre ciencia, tecnología e innovación (CTI) y su incorporación a la producción del Uruguay de la primera mitad del siglo xx. This study focuses on the history of the construction of Uruguay's first public hydroelectric power generation dam, the Rincón del Bonete Dam, inaugurated in December 1945. The study period begins in 1904, the year in which the first proposal for harnessing the Río Negro for electricity generation was made, and ends in 1945, the year in which the first turbine in Unit 2 of the dam was put into operation. In the time between these two extremes, there were different political and institutional configurations that, we understand, can account for a delay of more than forty years between the idea of ​​harnessing the Río Negro for hydroelectricity and its materialization. This work aims to delve into each of these configurations from a systemic perspective where the links and relationships between engineers and government take on special importance. The Dam's construction process is analyzed through the lens of the relationship between science, technology, and innovation (STI) and its incorporation into Uruguay's production in the first half of the 20th century. 2020-12 info:eu-repo/semantics/article info:ar-repo/semantics/artículo info:eu-repo/semantics/publishedVersion http://ridaa.unq.edu.ar/handle/20.500.11807/5719 spa info:eu-repo/semantics/openAccess https://creativecommons.org/licenses/by-nd/2.5/ar/ application/pdf Redes ISSN 1851-7072 ( en línea)
spellingShingle Energía hidroeléctrica
Política científica y tecnológica
Innovaciones
Política públicas
Uruguay
Hydroelectric power
Scientific and technological policy
Innovations
Public policies
Energia hidrelétrica
Política científica e tecnológica
Inovações
Waiter, Andrea
Capacidades de la ingeniería nacional y tomadores de decisiones: la construcción de la represa hidroeléctrica en Rincón del Bonete, Uruguay 1904-1945.
title Capacidades de la ingeniería nacional y tomadores de decisiones: la construcción de la represa hidroeléctrica en Rincón del Bonete, Uruguay 1904-1945.
title_full Capacidades de la ingeniería nacional y tomadores de decisiones: la construcción de la represa hidroeléctrica en Rincón del Bonete, Uruguay 1904-1945.
title_fullStr Capacidades de la ingeniería nacional y tomadores de decisiones: la construcción de la represa hidroeléctrica en Rincón del Bonete, Uruguay 1904-1945.
title_full_unstemmed Capacidades de la ingeniería nacional y tomadores de decisiones: la construcción de la represa hidroeléctrica en Rincón del Bonete, Uruguay 1904-1945.
title_short Capacidades de la ingeniería nacional y tomadores de decisiones: la construcción de la represa hidroeléctrica en Rincón del Bonete, Uruguay 1904-1945.
title_sort capacidades de la ingenieria nacional y tomadores de decisiones la construccion de la represa hidroelectrica en rincon del bonete uruguay 1904 1945
topic Energía hidroeléctrica
Política científica y tecnológica
Innovaciones
Política públicas
Uruguay
Hydroelectric power
Scientific and technological policy
Innovations
Public policies
Energia hidrelétrica
Política científica e tecnológica
Inovações
url http://ridaa.unq.edu.ar/handle/20.500.11807/5719
work_keys_str_mv AT waiterandrea capacidadesdelaingenierianacionalytomadoresdedecisioneslaconstrucciondelarepresahidroelectricaenrincondelboneteuruguay19041945
AT waiterandrea nationalengineeringcapabilitiesanddecisionmakerstheconstructionofthehydroelectricdaminrincondelboneteuruguay19041945